Industrial

  • Virginia Transformer Virginia Transformer
    Virginia Transformer

    Project Name
    Virginia Transformer

    Address
    Troutville, VA

    Architect
    Interactive Design Group

    This project utilized a team build approach to help the client achieve a tight timeframe to have the new manufacturing facility constructed and producing product. The project site selected was the former lite gage steel manufacturing plant in Botetourt County. The scope of work included renovating 11,850 SF of the existing metal facility and a new 32,800 SF addition to house the fabrication shop. Office space totaling 4,600 SF was also included in the addition. The expansion allows for future growth to manufacture 100-ton electrical transformers.

  • NanoSonic NanoSonic
    NanoSonic

    Project Name
    NanoSomic

    Address
    Pembroke, VA

    Architect
    Craddock Cunningham

    This bid project involved the 30,000 square foot build-out of an existing shell building to house Nanosonic and their high-tech development of revolutionary new molecular self-assembly processes. The beautiful new office, research, and industrial facility was built within Giles County's new environmentally friendly Wheatland Eco-Park.

  • Elizabeth Arden Expansion Elizabeth Arden Expansion
    Elizabeth Arden Expansion

    Project Name
    Elizabeth Arden Expansion

    Address
    Roanoke, VA

    Architect
    McKinney & Company Architects

    A 134,000 square foot addition to logistics center originally built by our company in 1991 for valued repeat client, Elizabeth Arden. With the new addition, Elizabeth Arden's Roanoke facility will house the company's consolidated U.S. distribution operations.

  • Optical Cable Corporation, Phase II Optical Cable Corporation, Phase II
    Optical Cable Corporation, Phase II

    Project Name
    Optical Cable Corporation, Phase II

    Address
    Roanoke, VA

    Architect
    McKinney & Company Architects

    This project involved the fast-track construction of a 74,000 square foot office and high-tech production facility addition to double the capacity of the original facility completed in 1990. Architectural pre-cast concrete wall panels add a clean, distinctive look to the pre-engineered structure designed for optimal cost efficiency and an accelerated scheduled. We were able to turn this project over to the owner in 90 days.

  • R.R. Donnelley & Sons Company, Roanoke Manufacturing Division - Design/Build R.R. Donnelley & Sons Company, Roanoke Manufacturing Division - Design/Build
    R.R. Donnelley & Sons Company, Roanoke Manufacturing Division - Design/Build

    Project Name
    R.R. Donnelley & Sons Company, Roanoke Manufacturing Division
    Design/Build

    Address
    Salem, VA

    Architect
    Hayes, Seay, Mattern & Mattern, Inc.

    Constructed in the Valley Tech Industrial Park in Roanoke County, this design/build project included the construction of a 276,000 SF book printing facility, related offices, and all site work. It houses approximately 44,000 SF of finished office space, 48,000 SF of storage/warehouse space, and an 184,000 SF area for the presses and bindery lines. The exterior is a combination of architectural pre-cast concrete panels and brick veneer with continuous bands of windows and glass curtain wall. This fast-track, design/build project required a total construction time of eight months, starting at the end of July 1996.

  • Vitramon, Incorporated - Industrial Addition- Phase II Vitramon, Incorporated - Industrial Addition- Phase II
    Vitramon, Incorporated - Industrial Addition- Phase II

    Project Name
    Vitramon, Incorporated - Industrial Addition- Phase II

    Address
    Roanoke, VA

    Architect
    The Greenwood Partnership

    This fast-track project included construction of a 12,000 square foot addition to the capacitor chip manufacturing facility, in addition to a 5,000 square foot clean-room and extensive mechanical and electrical work.

  • York International York International
    York International

    Project Name
    York International

    Address
    Roanoke, VA

    Architect
    Rife + Wood Architects

    Phase I of an up-fit of an existing pre-engineered building into a manufacturing plant and office housing, approximately 75,000 square feet.

  • Vitramon, Incorporated - Industrial Addition - Phase I Vitramon, Incorporated - Industrial Addition - Phase I
    Vitramon, Incorporated - Industrial Addition - Phase I

    Project Name
    Vitramon, Incorporated - Industrial Addition - Phase I

    Address
    Roanoke, VA

    Architect
    The Greenwood Partnership

    Construction of a 44,000 square foot addition to an existing capacitor manufacturing facility. Work included sophisticated mechanical and electrical work and the construction of a clean-room. The microelectronic chip manufacturing process clean room was constructed adjacent to another clean room which remained active and suffered no loss production.

  • Transkrit Corporation Transkrit Corporation
    Transkrit Corporation

    Project Name
    Transkrit Corporation

    Address
    Roanoke, VA

    Architect
    Laser, Guest, Hendrix & Reddick

    This 75,000 square foot printing plant with its 40,000 square foot offices and corporate headquarters was a fast-track relocation project spanning a five-month period which encompassed a severe weather season. The office area includes a centralized computer room, an employee break room, a cafeteria with courtyard, and upscale corporate executive offices. The plant area is fully air-conditioned and humidity-controlled.

  • Yokohama Tire Company Yokohama Tire Company
    Yokohama Tire Company

    Project Name
    Yokohama Tire Company (formerly Mohawk Tire)

    Address
    Salem, VA

    Architect
    Doyle & Associates

    Construction of a two story 31,640 square foot addition housing the cafeteria, restrooms, and office space from within the existing facility.

  • Hollister Addition Hollister Addition
    Hollister Addition

    Project Name
    Hollister Addition

    Address
    Stuarts Draft, VA

    Architect
    Hughes Associates Architects

    Construction of a 60,000 square foot single story addition of the rear of an existing facility. The structural steel with brick veneer facility was fully heated and air conditioned. This provides manufacturing space, including an environmentally controlled sterile room, for highly automated production for pharmaceutical manufacturer, Hollister.

  • Virginia Transformer Virginia Transformer
    Virginia Transformer

    Project Name
    Virginia Transformer

    Address
    Roanoke, VA

    Architect
    Balzer & Associates

    Construction of a 96,000 square foot office and manufacturing facility consisting of an 18,000 square foot office area with standard finishes and a 78,000 square foot heavy manufacturing facility with special concrete floors and overhead crane systems.

  • Advance Auto Advance Auto
    Advance Auto

    Project Name
    Advance Auto

    Address
    Roanoke, VA

    Architect
    Kinsey Shane & Associates

    This fast-track, team-build project involved the construction of an 186,000 square foot addition to an existing distribution center for auto part giant, Advance Auto.

  • Optical Cable Corporation Optical Cable Corporation
    Optical Cable Corporation

    Project Name
    Optical Cable Corporation

    Address
    Roanoke, VA

    Architect
    McKinney & Company

    Construction of a 74,000 square foot single-story office and production facility for a glass-fiber cable manufacturing company. A subsequent addition doubled the size of the facility and was designed/constructed to enhance production flow and maintain the environmental conditions necessary for product quality.

  • Bacova Guild, Ltd. Bacova Guild, Ltd.
    Bacova Guild, Ltd.

    Project Name
    Bacova Guild, Ltd.

    Address
    Low Moor, VA

    Architect
    McKinney & Company

    Our company provided pre-construction and construction services for this pre-engineered facility which houses 335,580 square feet of manufacturing, warehousing, and office space. This six-month fast-track project was built on a beautiful, but challenging mountain site in the Alleghany Highlands.

  • Maple Leaf Bakery Maple Leaf Bakery
    Maple Leaf Bakery

    Project Name
    Maple Leaf Bakery

    Address
    Roanoke, VA

    Architect
    The Dennis Group

    Our company constructed this 77,200 square foot commercial bakery facility. The project was conventional construction using pre-cast concrete walls in the production area and brick veneer in the main office. Project included a special foundation for blast freeze process and an 18,000 square foot cold storage area to accommodate temperatures of -20 degrees. Using the fast-track approach, the foundations were poured in July of 1997 and the project was completed in January of 1998.

  • CAPCO Machinery Systems CAPCO Machinery Systems
    CAPCO Machinery Systems

    Project Name
    CAPCO Machinery Systems

    Address
    Roanoke, VA

    Architect
    Kinsey Shane & Associates

    Pre-engineered building with 11,000 square feet of office space and 27,000 square feet of manufacturing space.

  • Dominion Forms Dominion Forms
    Dominion Forms

    Project Name
    Dominion Forms

    Address
    Roanoke, VA

    Architect
    Doyle & Associates

    A design/build project involving the construction of a two-story, 16,000 square foot brick office building with pre-engineered steel frame and a 15,000 square foot warehouse.

  • Foot Levelers, Inc. Foot Levelers, Inc.
    Foot Levelers, Inc.

    Project Name
    Foot Levelers, Inc.

    Address
    Roanoke, VA

    Architect
    The Durant Group

    Team-build project involving the construction of a new manufacturing facility for orthotics manufacturer, Foot Levelers, Inc.

  • Botetourt County Industrial Shell Building

    Project Name
    Botetourt County Industrial Shell Building

    Address
    Roanoke, VA

    Architect
    Rife + Wood Architects

    This 75,000 square foot shell building was built as a speculative building to attract clients to the industrial park. The project was limited to an enclosed metal building with no slab on grade and with electrical and mechanical systems limited to bare essentials.

  • Medeco Security Locks, Inc.

    Project Name
    Medeco Security Locks, Inc.

    Address
    Salem, VA

    Architect
    Kinsey Shane & Associates

    Construction of a 5,040 square foot pre-engineered office and manufacturing facility for high-end security lock manufacturer, Medeco.

  • Atlantic and Pacific Telecom, Inc.

    Project Name
    Atlantic and Pacific Telecom, Inc.

    Address
    Roanoke, VA

    Architect
    Kinsey Shane & Associates

    New pre-engineered 6,000 square foot office/15,000 square foot warehouse facility for Atlantic and Pacific Telecom, Inc.

  • Gordonsville Energy Limited Partnership - Administration Building

    Project Name
    Gordonsville Energy Limited Partnership
    Administration Building

    Address
    Gordonsville, VA

    Architect
    Helene, Combs, Dreiling

    Construction of a two-story, pre-engineered building housing administration offices and a maintenance and warehouse facility.

  • G.E. Fanuc - CNC Manufacturing Expansion

    Project Name
    G.E. Fanuc - CNC Manufacturing Expansion

    Address
    Charlottesville, VA

    Architect
    Dale C. Hamilton & Associates

    Construction of a new addition to house CNC Manufacturing equipment secured through design-build process.

  • Gordonsville Energy Limited Partnership - Hazardous Material Storage

    Project Name
    Gordonsville Energy Limited Partnership
    Hazardous Material Storage

    Address
    Gordonsville, VA

    Architect
    Helene, Combs, Dreiling

    This project entailed the construction of a small new metal building with concrete floors for Gordonsville Energy Limited Partnership.

  • Champs Winery

    Project Name
    Champs Winery

    Address
    Charlottesville, VA

    Architect
    Sequoia Development Corporation

    Our firm provided pre-construction and construction services for this first phase of a new Charlottesville, Virginia winery.

  • ITT Tevis Automotive

    Project Name
    ITT Tevis Automotive

    Address
    Culpeper, VA

    Architect
    Wiley & Wilson

    Construction of a specialized pre-engineered metal building to house automotive industrial processes.

  • Martin Film Processing

    Project Name
    Martin Film Processing

    Address
    Martinsville, VA

    Architect
    Knight & Turner Architects

    Construction of a 45,200 square foot pre-cast addition to a film processing plant. Our scope of work did not include mechanical, electrical or plumbing.

  • Rochester Corporation - Wire Rope Plant

    Project Name
    Rochester Corporation - Wire Rope Plant

    Address
    Culpeper, VA

    Architect
    Jerry Christensen

    Construction of a 6,000 square foot clean-room and an 11,000 square foot addition to a wire rope plant. The addition was a pre-engineered structure with pre-cast wall panels. Special design considerations included accommodating a 50-ton overhead crane.

  • Commonwealth Components

    Project Name
    Commonwealth Components

    Address
    Roanoke, VA

    Architect
    Kinsey Shane & Associates

    Team-build project involving the construction of a 52,000 square foot Truss manufacturing facility.

  • Barboursville Vineyards

    Project Name
    Barboursville Vineyards

    Address
    Barboursville, VA

    Architect
    McKinney & Company

    Construction of a pre-engineered building addition to an existing facility housing a wine bottling assembly line, a hospitality area, and a warehouse. This building, added to the west side of the existing building, created a covered area for the grape presses and a drive-through for unloading the freshly picked grapes.